Quảng cáo giữa trang chủ

Overview of An Phat high-tech industrial zone, Hai Duong

An Phat Complex industrial park is located at Km47, Highway 5, Viet Hoa ward, Hai Duong City. The industrial park has an important strategic location in the economic triangle of Hanoi, Hai Phong and Quang Ninh.

Total area of the industrial zone: 46 ha in which:

  •   _Industrial park land
  •   _Land in outside of industrial zone:
Distance to important transport hubs:
  •   _Road distance: From National Road 5A: 100 m
  •   _Distance to ports: Hai Phong Port: 50 km, Dinh Vu Port: 55 km
  •   _Distance to airport: Noi Bai Airport: 71 km, Cat Bi Airport Hai Phong: 55 km

 

                           

Available infrastructure: internal road system, power supply system, water and waste water treatment system 

The surrounding facilities: 50m from the customs office, 2km from the supermarket, 3km from the hospital, 500m from Nacimex 4-star hotel,  4km from the cinema, 26km from the Golf Club.
 

At present, thanks to a professional one-stop service, surround utilities and close cooperation with Hai Duong University, 60% of the industrial park area was filled within a year, showing the trust of investors.

 
The ecosystem of An Phat industrial park creates convenient conditions for investors to save related costs, opening up opportunities for cooperation in the production of products such as products and biodegradable material, packaging, engineering plastics and building material plastics, precision engineering and molds, plastic materials and chemicals …
 
Incentives: free support for business registration and fire safety appraisal.
 
Supports for customer: 
 
IP is willing to support customers: in investment certificate, carrying out procedures for granting seals and tax codes, supporting the preparation of environmental impact assessment reports, construction permit application, extracting maps, public works utility connection, installation of telephone systems, telecommunications, internet, support for recruitment and providing industrial meals, accommodation for experts and workers, support in providing transport services, import and export procedures, support to access capital from banks: Vietinbank, BIDV, VPBank...
 
 
 
 
 
 
It is expected that the entire system of factories in IP will be improved, repaired, and ready for production and business in July 2020.
 
Sharing the reason for investing in An Phat Complex, An Phat Holdings Group said that the Group wants to attract domestic and foreign investors; building modern infrastructure for the Group's projects, diversifying its operations, realizing the revenue target of 1 billion USD in 2018...
 
The Group determines, the project term lasts about 39 years (2018 - 2056), the capital payback period is 10 years and 6 months. The revenue of the industrial park will mainly come from providing land for sub-leasing for 40 years and factory for lease, the remaining part comes from the collection of wastewater treatment fees and infrastructure use fees.
Search:
Lastest Factories
Industrial land for sale
Professional Consultant
Mr. Nguyen Minh Chinh (EN)

Mr. Nguyen Minh Chinh (EN)

Director

Follow us on
Facebook YouTube tiktok Skype Line Wechat

© 2015 Factory for lease

BAO TIN PROPERTY INVESTMENT CONSULTING COMPANY LIMITED (No. 14, 143 Lane, Nguyen Ngoc Vu street, Cau Giay, Hanoi)

Whatsapp:: 0966.398.919

Hotline:: 0966.398.919

Email: baotinct@gmail.com (for English)

img

Send request