Nam Son - Hap Linh industrial zone
Nam Son – Hap Linh urban industrial zone has a total planned area of 1,000 hectares in which industrial park of 200ha of urban area, nearby national road 38, near national road 18 (Noi Bai international airport-Ha Long City, Quang Ninh route)
Nam Son - Hap Linh urban industrial zone
Nam Son – Hap Linh urban industrial zone has a total planned area of 1,000 hectares in which industrial park of 200ha of urban area, nearby national road 38, near national road 18 (Noi Bai international airport-Ha Long City, Quang Ninh route) is very favorable in attracting foreign investors, especially the satellite companies from the world's leading corporations that have been investing here.
No |
Detail informations |
|||
1 |
Project |
Nam Son – Hap Linh industrial zone in Bac Ninh |
||
2 |
Infrastructure development unit |
Kinh Back urban development corporation |
||
3 |
General information |
|||
-Location |
Bac Ninh province |
|||
-31km from Ha Noi |
31km |
|||
- Contiguous area |
Ha Noi, Bac Giang, Hai Duong, Hung Yen |
|||
- Area |
803,9 square kilometers |
|||
- Population |
1.100.000 người |
|||
- Average temperature |
23,3o |
|||
- Average moisture |
79% |
|||
- Average rainfall/year |
1.400mm – 1.600mm |
|||
4 |
Industrial zone scale (Total area) |
402 ha |
||
5 |
Operating time |
50 years - Phase: 2006 – 2056 |
||
6 |
Rent form |
- Available infrastructure - For rent or sale standard factory |
||
7 |
Competitive advantages |
- Convenient traffic. - Solid land floor, reduce cost for cononstruction. - Many investors in electronics,exact mechanics fields in industrial zone - Modern infrastructure system - Competitive price |
||
8 |
Regulations about construction in industrial zone |
|||
|
Minimum floor height compared to sea surface |
+ 5.00m |
||
|
Area for building factory |
£ 65% of total rent area |
||
|
Factory fence |
2m – 2.2m |
||
|
Minimum distance from fence to work construction range |
4.5m |
||
|
Minimum distance from internal road to construction range |
6m |
||
9 |
Land lease rental and other costs |
|||
|
Land rental
|
52 – 60 USD/sqm, depending on position of land spot (not included VAT) |
||
|
Land rental |
N/A |
||
|
Standard factory rental(5000sqm/factory) |
3 USD/sqm/month (not included VAT) |
||
|
Management fee (road sanitation,green tree, security…) |
0.0175 USD/sqm/month |
||
|
Infrastructure maintainance fee |
0.2 USD/sqm/year |
||
|
Electricity price(VND /kWh) Voltage from 22KV to under 110KV |
According to price table of EVN issued in 2009: (not included VAT) |
||
- Normal hour: |
870 |
|||
- Peak hour: |
1.755 |
|||
- Off-peak hour |
475 |
|||
|
Water price (included VAT) |
5.000 đ/cubic meters |
||
|
Other services fee (telephone,fax, internet…) |
According to regulation of provider |
||
|
Transport fee |
Not include VAT and loading-unloading priceđầu The price can be changed in the stage and types of goods. |
||
|
To Lạng Sơn |
300 USD/20’DC 335 USD/40’DC |
||
|
To Hải Phòng port |
168 USD/20’DC 190 USD/40’DC |
||
|
To Cái Lân port (Quảng Ninh) |
185 USD/20’DC 215 USD/40’DC |
||
10 |
Labor |
|||
|
Labor source |
Population of Bac Ninh: 1.100.000 people, in which: - Rural area : 76,5% - Urban area: 23,5% Labor age: 60% |
||
|
Salary |
|||
- Unskilled labor: minimum salary |
1.040.000 VND/worker/month (~ 57 USD) |
|||
- Practical average salary |
70 USD/worker/month |
|||
- Engineer, office staff |
200-250 USD/people/ month |
|||
- Manager: |
300-500 USD/people/month |
|||
- Social insurance |
20% (enterprise: 15%, worker: 5%) |
|||
- Health insurance : |
3% (enterperise: 2%, labor: 1%) |
|||
- Unemployment insurance : |
3% (enterprise:1%, labor:1%, state:1%) |
|||
11 |
Preferential policies |
|||
|
Incentives about enterprise income tax |
The regulations of State |
||
|
Tax exemption on export and import |
- For equipment and machinery (accessories included) and means of transport in the technological line, building materials can not be produced in domestic areas - A special project encouraged for investment, components manufacturing project, mechanical parts, electronics projects is exempted tax on import of raw materials during the first 05 years since beginning of the production and business - Raw materials, spare parts and imported materials for production of export goods. |
||
|
Tax exemption |
- In case of import of equipment, machinery, specialized means in the technological chain which can not be produced in domestic areas. - For materials imported for production or processing of export goods under the manufacturing contract, export processing signed with foreign parties; goods and services traded between foreigners with non-tariff areas, and between the non-tariff zones to each other . |
||
|
Tax for trasfering profit abroad |
Tax rate: 0% |
||
12 |
Supports from infrastructure development company |
- Support in the procedures about investment certificate - Support some procedures after investment (seal, tax code, personnel registration) - Support for the procedures for issuing certificates of land use right - Support for recruit labor - Assisting in the organization of the ground breaking ceremony, factory inaugurating ceremony the of investors - Support for lease office at favorable rental during plant construction time |
||
13 |
Typical investors in industrial zone |
- Japan: Canon, Tenma, Nippon Steel, Mitsuwa, Toyo Ink, Yamato, NYK, Nippon Express.. - Taiwan: Foxconn, Mitac, Dragonjet, Seiyo, Longtech, Sentec, Seewell, Wong’s electrics, Nylok, Henry, … - Others: Tyco Electrics, VS group, Liwayway, Jebsen & Jessen, NCC…. |
(khucongngiep)