Chau Son industrial zone
Located in South-West of Phu Ly city, Ha Nam Province, with total area of 170 hectares, Chau Son industrial park almost attracts the investors of industrial fields such as constructive materials made of cement, agro-forestry product processing
Chau Son industrial zone
Located in South-West of Phu Ly city, Ha Nam Province, with total area of 170 hectares, Chau Son industrial park almost attracts the investors of industrial fields such as constructive materials made of cement, agro-forestry product processing, electronic and refrigerant assembly, mechanics for agriculture and consumer goods and textiles production.
Chau Son Industrial Zone
Investor: Ha Nam People’s Committee assigned for VPID to invest in technical infrastructure for an area of 117ha on the 169ha scale of industrial zone. In the process of implementation of investment and building, Chau Son industrial park has been completed flat clearance and evict entire 169 hectares. The construction of the road system, electricity, water, communications are being constructed in time to serve the demand of enterprises.
OVERVIEW OF CHAU SON INDUSTRIAL ZONE |
|||
I – GENERAL INFORMATION |
|||
Company name |
Ha Nam VPID One Member Company Limited ( Branch of Vinh Phuc Infrastructure Development Joint Stock Company ) |
||
Project name |
CHAU SON INDUSTRIAL PARK (CSIP) |
||
Address |
Chau Son IP, Chau Son commune - Phu Ly city - Ha Nam province |
||
Tel |
(84-351) 6252137 |
||
Fax |
(84-351) 6252138 |
||
|
vpid.kcnchauson@gmail.com; hongha06@vnn.vn |
||
Website |
www.vpid.vn |
||
Chau Son industrial zone in map |
www.wikimapia.org/#lat=20.5156249&lon=105.8949852&z=15&l=38&m=b |
||
Contact |
Mr. Phạm Trung Kiên : 0989 255 446 and Mr. Phạm Hữu Ái : 0913 231 236 |
||
Scale |
Total area : 170 ha |
||
Legal bais |
- Official Letter No. 807/UBND-DN & XTDT on June 25th, 2007 issued by Ha Nam province's people Committee |
||
Types for lease |
Land for lease Factory for lease |
||
Rental period |
1. For 5 years |
||
II – LOCATION AND REGIONAL RELATIONS |
|||
Ha Noi center |
55 km from Ha Noi center |
||
Airport |
85 km from Noi Bai international airport |
||
Highway |
2km form national road 1A |
||
Waterway |
500m from Thinh Chau port |
||
Harbor
|
120km from Hai Phong seaport 150km from Cai Lan seaport of Quang Ninh province |
||
Railway |
3km from Phu Ly station of Vietnam railway from North to South |
||
III – INFRASTRUCTURE |
|||
Construction flat |
Backfill and processing for ready to build factories, facilities when handing over |
||
Elevation |
The ground leveling 3.5m high compared to sea level |
||
Power supply |
Electricity power is always supplied stably by a substation of 110/35 KVA. |
||
Water supply |
Be supplied by Phu Ly clean water Company with the capacity of 25.000 m3 a day. Water supplying system is set up to fence of the factories. |
||
Drainage system |
Drainage systems of rainy water and sewage are built separately. Sewage is draining to its treatment system of Industrial Park. |
||
Sewage treatment
|
Most of sewage must be treated firstly by the manufactories, which reaching B standard (QCVN 40: 2011/BTNMT) before flowing to the drainage system of Industrial Park. Solid waste of the factories is going to be classified and moved to a place to treat. |
||
Telecommunication and internet
|
Viettel telecommunication corporation (Viettel Telecom) is ready to meet demands of 9 - 10 lines/ ha Underground cable is set up to fence of the manufactories. |
||
Internal traffic and |
Internal traffic is designed properly, which can be sure that all vehicles are easy and convenient to move. |
||
Extinguishing system |
Water supply system and extinguishing valves are also installed along all of roads. |
||
Environment |
Area of green tree is about 14% of total one with the bush and some trees along all roads. |
||
IV - SOCIAL INFRASTRUCTURE AND SERVICES |
|||
Custom |
All of procedures are made by Ha Nam's customs. A customs office is planned to locate at industrial Park so as to deal with customs procedures promptly and properly for enterprises. |
||
Bank
|
Some banks such as: Vietinbank, Vietcombank, BIDV, DongA, Sacombank, Agribank, Maritimebank and so on. The Industrial Park Developer will invite some banks to open their transaction offices at the Industrial Park to meet the demand of enterprises on financial deals. |
||
House for worker
|
Some housing area are being planed and built in the next urban areas by the investor - Hanoi Urban Development Company (HUD) . |
||
Health service
|
Ha Nam General Hospital, Viet - My hospital and some health care centers. |
||
Bus system
|
Bus from Hanoi Capital to Phu Ly city and in return daily transports from 5h00 - 19h30 with 20 minutes for one bus. |
||
V – RENTAL PRICE AND FACILITIES CHARGE
|
|||
Rental price consists |
32 – 33 USD/m2/ period of the project. Depend on position and scale of blocks |
||
Rental price for raw land |
Pursuant to the regulation of Ha Nam province's people committee at the time of annual payment (0.085 USD/m2), but now it is exempting for investors who come soon. |
||
Current management fee
|
0,3 USD/sqm/year- annual payment |
||
Power price
|
1,139 VNĐ/Kwh ( 0.056 USD/Kwh ) for normal hour ( 4:00 am – 9:30 am, 11:30 am - 17:00 pm, 20:00 pm – 22:00 pm) excluding 10% VAT. |
||
Water price |
11,500 VND/m3 (not consisting of 5% VAT) and 300 VND for environment fee (free tax) |
||
VI – LABOR FORCE |
|||
Local |
At present, labor resource of Ha Nam province is about 600 thousands people in general and 55 thousands labors in Phu Ly city in particular. They are meeting the demands of the enterprises about intellectual, unskilled and skilled labors. |
||
Hanoi capital |
Hanoi is a big center of education and training in Vietnam with many leading universities and colleges. |
||
Salary |
Current wage: |
||
VII - REGULATION OF CONSTRUCTIVE MANAGEMENT |
|||
Types of construction |
Factory, stock, restaurant, operator buildings and other works such as: vehicles parking area, security house, electric station and water tank for extinguishment. |
||
Prohibited constructions |
Building house and project of the exploitation of groundwater.
|
||
Construction limit |
Factory, office building and restaurant (not to be vehicles parking area, electric station) must be built 10m far from boundary of internal road and 6m far from fence of nearby block. |
||
Building density
|
50 - 65% |
||
Average elevation |
Factory: 1-2 floors, office: 1-4 floors. Maximum height of each floor is 4m |
||
Fence
|
Maximum height of fence along car road is 2.3m from ground, open fence from painted iron bars Fence between land plot is not over 2m and no using barbed wire. |
||
Extinguishing and |
Each company should maintain the fire alarm and extinguishing system for their safety. |
||
VIII – REFERENCE |
|||
Building cost of |
120 - 180 USD/m2 (The real building cost basing on the detailed design of factories and time of construction.)
|