Quảng cáo giữa trang chủ

Quang Minh Industrial Zone

Quang Minh Industrial zone has been established under Decision No 3742/2004 / QD-UB issued by the People's Committee Chairman of Vinh Phuc province (old) now located in Hanoi city...

Quang Minh Industrial Zone

Being issued on October 22, 2004, the establishment and approval of projects and by Nam Duc investment and infrastructure development Co., Ltd

- Total area: 344.4 ha.

- Position: Me Linh District, Hanoi.

- Investors build infrastructure development: Investment and infrastructure development Co., Ltd

- Land use term: up to 2053.

                                                The overall picture of the Quang Minh Industrial Zone

                   

Geographical location of industrial zone:

Quang Minh Industrial Park is located in Quang Minh town and Chi Dong town, Me Linh district, Hanoi City with an area of ​​344.4 hectares. The scope and boundary are defined as follows:

- North: adjacent to the residential area near ​​Ca Lo river in Quang Minh Commune

- South: adjacent to the highway axis Bac Thang Long - Noi Bai

- East: adjacent to Kim Hoa commune, Me Linh District, Hanoi

- West: adjacent to the railway line Hanoi - Lao Cai

Quang Minh Industrial Park is considered the first multi-sector industrial park, less environmental pollution, including such key sectors: Electronic engineering assembly industry, food processing, light industry, consumer goods , jewelry processing, manufacturing of electronics components correctly, motorcycle, automotive parts,  household electrical appliances, mechanical ...

 Distance to the Quang Minh Industrial Park:

 - 3km from The Noi Bai International Airport

-  15km from the center of Hanoi

-  100km from the Hai Phong port

-  120km from deep water port in Quang Ninh - Cai Lan

Quang Minh Industrial Park is located close to North Thang Long - Noi Bai Highway and Hanoi - Lao Cai railway, close to Noi Bai international airport, positioned in front of national railway axis and national road 18, entering to Hai Phong  port and Cai Lan-Quang Ninh deepwater port , convenient for transportation, storage import and export cargo.

Labor resources:

 Hanoi is a big city which concentrates most of Universities and Colleges, the largest intermediate of Vietnam northern , with a series of prestigious schools systems, which annually provides thousands of workers who are intensively trained on the management, techniques and skills. Besides,  with the population of Hanoi about 6.5 million people, in which people in working age account for about 70% of the population . This labor source can fully supply, ensure for demand of investors in industrial zones.

 Moreover, the distance from the center of Hanoi to the industrial zones, industrial clusters is only about 7km , convenient for traveling from Hanoi to industrial zones everyday of labors.

 TECHNICAL INFRASTRUCTURE :

 Soil conditions:

 - The average grading of 9.8 m

- Soil quality: hard and land leveling

 Power supply source:

 - Power supplied to meet continuously and stably is taken from the high voltage line of Hanoi city

- Total output power for the whole area is about 60,000 KVA.

- Power Network is supplied in an industrial zone along to internal road axes, business invests and constructs transformer stations according to the power consumption of your business.

 Drainage mechanism:

 Rain water(domestic wastewater) and industrial wastewater treatment system was separately built. Wastewater will be to the wastewater treatment plant of the industrial zone. Rainwater is obtained through drain system and to the river in the area.

 Solid waste disposal and waste water:

All of the industrial waste water, domestic waste water is processed until  reaching minimum standards for water level C before being discharged into the overall wastewater system of industrial park. Then industrial park will continue to handle to meet standards prescribed by the state government of Vietnam.

 The solid wastes: enterprises in the industrial park will have to sign the contract in classifying, collection and transportation of waste to the functional unit for classification, collection and transportation of waste in order to transport garbage out of industrial zone which avoids causing environmental pollution.

 Clean water supply system: To be connected until the borderline of each business.

 Internal transport systems in the industrial park:

 - Reasonably designed to serve for traveling needs of the transport to each land plot in an easy and convenient way.

 - Main road system  wide 36m, branch road 24m wide

 - Road lighting system is installed along the routes.

Green tree system:

 Green tree system accounts about 10-12% of the total area of ​​the Industrial Park

 Information system:

 Telecommunication system meets international standards and always ready to meet all the communication requirements. Submarine optical cable system is directly connected to the borderline of each enterprise.

 REGULATIONS ON CONSTRUCTION MANAGEMENT :

 Building density:

 Entire works of the construction "footprints" is not exceed 65% of the total area of ​​the plot. Acceptable ratio of the floor is not exceeded 200% of the total area of ​​the plot

 Average height:

 1-2 floors for the factory, 1-4 floors for office, maximum height of each one is 4 meters.

 Construction boundary:

 The main works such as factories, offices, cafeterias, ... (except for secondary works such as garage, transformer, ...) must be built from the internal line boundary 6m, and from fence of next land plot 3.5 m.

Height:

 The minimum building height not exceeding 13m high vertical distance from a given background to the highest point of the roof.

 Fence:

 The maximum height of fence along the car road is 2.3 m

Barriers between the lots is not higher than 2 meters and not using barbed wire

 Firefighting systems and the lightning rods:

 Land lessee layout and maintain effective fire alarm system and firefighting system for each works in the land spot.

Any construction in the plot range must be equipped with lightning rod under appropriate design.

 

                                                                                                                                                                      Source: hiza

(hiza)

Search:
Lastest Factories
Industrial land for sale
Professional Consultant
Mr. Nguyen Minh Chinh (EN)

Mr. Nguyen Minh Chinh (EN)

Director

Follow us on
Facebook YouTube tiktok Skype Line Wechat

© 2015 Factory for lease

BAO TIN PROPERTY INVESTMENT CONSULTING COMPANY LIMITED (No. 14, 143 Lane, Nguyen Ngoc Vu street, Cau Giay, Hanoi)

Whatsapp:: 0966.398.919

Hotline:: 0966.398.919

Email: baotinct@gmail.com (for English)

img

Send request