Thuan Thanh 3 industrial zone
Thuan Thanh 3 industrial zone is located in Thanh Khuong commune, Thuan Thanh district, Bac Ninh province; has a total planned area of 1000ha during an operating time of 50 years...
Thuan Thanh 3 industrial zone
Detail information
Location: Bac Ninh
Type: industrial parks, export processing
Total area: 1000 ha
Total investment:
Commencement date: 12/2007
Expected completion date:
Status :
Investor: Khai Son company
Description
Place: Thanh Khuong commune, Thuan Thanh district, Bac Ninh province
Investor (Infrastructure Development Company): Khai Son company
Scale: The total planned area of 1,000 ha is implemented in stages:
- Stage 1: 140 hectares, being under construction and expected to begin in 12/2007.
- The next stages would be implemented respectively after Stage 1.
Establishing decision: investment certificate No 21221000068 on September 21, 2007 of Head of Management of Bac Ninh Industrial Zone issued for Khai Son company about construction investment and infrastructure trading in Thuan Thanh 3 industrial zone, Bac Ninh province.
Operating time: 50 years (from 2007 to 2057)
The main investment areas in industrial zone: Production, Electrical assembly, Electronics, Telecommunications, Mechanical engineering; Production of steel and steel products; Production of consumer goods; Processing of agricultural products and food ...
Method for lease: For lease land, factories, warehouses..
Location and regional relations
Hanoi center: 22 km from Ha Noi center in the northeast (about 30 minutes by car)
Road: Located adjacent to national road 282 and the ring road 4 of Hanoi, 10km from national road 5, near national road 1B and 18
Seaport, river: Close to A Lu ports of Duong River, 80km from Hai Phong port, 110km from Cai Lan deep water port (Quang Ninh)
Airport: 30km from Noi Bai international Airport (40 minutes by car)
Railway: 9km from Lac Dao train station, Co Bi station 11 km.
Infrastructure
Planning: Complete and modern planning suitable to the overall planning, modern and synchronized infrastructure with international standards.
Construction flat: Available for building factory, warehouse…
Wastewater and waste treatment:
- Each plant have to handle wastewater by biological treatment systems. Wastewater is treated locally at the plant before being discharged into the overall drainage system of industrial zone.
- Solid waste from the plant will be classified, collected and transported to concentrated landfill.
Environment and green trees: Industrial zone spends about 9.825sqm land to plant green trees in front of operating areas and arrange into the greensward along the roadside; contribute to decrease pollution and improving the environment of industrial zone. In addition, there is a small lake near office and many green trees inside the factories.
(khucongngiep)